Home Additions and ADUs

Real Deal Builders builds home additions and detached ADUs, also called granny flats, from permit application through final inspection. An addition or an ADU is a longer, more permit heavy project than a remodel because it changes the footprint or the height of the home, and every step, from plan check to foundation to framing to inspections, is on the city's schedule. We handle the design, the permit process, and the build, and we set expectations for a real six to fourteen month timeline so the household side of the project is planned rather than improvised. When you are done, you have a permitted, inspected, and legally recorded addition to your home.

Completed two story home addition with floor to ceiling glass, a timber clad garage, and finished landscaping
Typical timeline
6 to 14 months, permits included
Trades we manage
Foundation, framing, all trades, finishes
Permits
Required, plus plan check and inspections
Typical scope
Room addition, second story, or full detached ADU

Behind the work

How this comes together

01

Permits are the schedule, not the paperwork

The single biggest driver on the timeline of a home addition or ADU is the permit and plan check window. Depending on the city, plan check for an addition can take weeks to months, and every correction extends that. We build that time into the calendar up front rather than treat it as a surprise, and we manage the plan check corrections with the city so the file moves rather than sits.

Once permits issue, the build itself runs in phases the city inspects: foundation, framing, rough plumbing and electrical, insulation, drywall, and final. Each phase is scheduled around an inspection. We coordinate those inspections so trades are on site when they should be, not sitting waiting.

02

Detached ADU or attached addition

A room addition or second story attaches to the existing house, which means the connection is where quality shows: how the new roof line meets the old, how the framing ties in, how the new floor meets the existing floor, and how the exterior finish matches. We detail those transitions before we frame them so the finished addition reads as part of the house.

A detached ADU or granny flat is a small house in its own right. It gets its own foundation, its own utility connections, its own address, its own setbacks, and its own set of inspections. That makes it a legally rentable or livable unit rather than a shed with plumbing.

Home addition and ADU permit-to-completion timeline Seven sequenced phases across six to fourteen months: design, plan check, permit issue, foundation, framing, MEP rough-in and inspection, drywall through final. Plan check is called out as often the longest single phase. Home addition or ADU timeline 6 to 14 months, permit is often the longest phase 1 2 3 4 5 6 7 8 9 10 11 12 13 M14 1 · Design + drawings 2 · Plan check + city correctionsOften longest single phase 3 · Permit issue 4 · Foundation 5 · Framing 6 · MEP rough-in + inspections 7 · Drywall through final 8 · Final inspection Planning City review + inspection On-site construction Plan check is often 2 to 6 months, depending on city and correction cycles.
Why permits are the schedule on a home addition. Six to fourteen months is the realistic window for a residential addition or ADU, and the permit and plan check window is often the longest single phase. Each phase depends on the city clearing the previous one.

What this service includes

  • Home addition construction, attached room additions, second story additions
  • Detached ADU and granny flat construction, ground up
  • Design and plan drawings, or coordination with your architect
  • Permit application, plan check corrections, and inspection scheduling
  • Foundation, framing, all trades under one schedule
  • Utility connections for a detached ADU, its own address and setbacks
  • Roof tie in and exterior finish matched to the existing house

Recent work

Home Additions and ADUs in the Santa Clarita Valley

Two story room addition under construction with new framing, sheathing, and scaffolding against the existing house
New room addition framed onto the back of a single story house, with roof trusses set and the wall framing exposed

Working with us

From first call to final walkthrough

  1. 01

    Free walk

    We come to your home or site, talk through what you want to change, and ask the questions that shape an accurate scope.

  2. 02

    Written quote

    A detailed, honest, written quote lands in your inbox. You know the scope and the number before any work begins.

  3. 03

    Trades in order

    We sequence the trades so each one sets up the next, with one point of contact holding the whole project together.

  4. 04

    Punch and walkthrough

    We walk every finish with you, correct anything on the list, and do not close the job until it is done rather than promised for later.

Common questions

Frequently asked

The questions we hear most often, answered plainly. If your question is not here, call us and we will answer it the same way.

Do you build detached ADUs and granny flats?

Yes. ADU and granny flat construction is a growing part of what we do. We handle everything from the design and permit process through foundation, framing, all trades, and final finishes, so you end up with a complete, permitted unit rather than a partial build you have to finish yourself.

Do you build room additions or just full ADUs?

Both. We build room additions, primary suite additions, second story additions, and full detached ADUs. A room addition uses the existing foundation and roof where possible and ties into the current house. A detached ADU is its own building from the ground up.

How long does a home addition take?

Six to fourteen months is a realistic window for a residential addition or ADU, from first design meeting to final inspection. The permit and plan check window is often the longest single phase, and it varies by city and by how many correction cycles the plans go through.

How long does an ADU take from start to finish?

Twelve to eighteen months is common for a fully detached ADU, again with plan check as the biggest variable. Some cities have ADU pre approved plans that speed up the process meaningfully, and we help you decide whether one fits your site.

Do you handle the permits and plan check?

Yes. We handle the permit application, plan check submittal, corrections back and forth with the city, and inspection scheduling. That is the whole reason you hire a licensed general contractor rather than piecing the project together yourself.

Do we need an architect for a home addition?

For most additions and ADUs, yes, an architect or a design professional needs to stamp the plans. We work with architects you already have and can recommend ones we have worked with before if you need. Bringing us in during the design phase saves money and time because we can flag constructability issues while they are still cheap to fix on paper.

Can we live in the house during a home addition?

Usually yes. We seal the addition from the existing house during framing and rough in so the interior stays livable, and we plan the utility tie in phases so you are not without water or power. There are always a few days where something is off, and we schedule those in advance so nothing is a surprise.

Does an ADU need its own address and utilities?

Yes. A detached ADU is legally a separate dwelling unit. It gets its own address, its own water and power connections in most cases, and its own inspections. Some cities allow shared utility with a separate meter. We walk you through what your city allows before we design the plan.

How much does a home addition or ADU cost?

Cost is driven by size, foundation and framing complexity, whether the addition adds a second story, the finish level, and how much site work is involved. We price against a specific written scope after the design is far enough along to be real rather than guessed at.

What is the biggest risk on a home addition project?

The two biggest risks are plan check delays and hidden conditions when the existing house is opened for the tie in. We manage plan check actively and we stop and show you anything unexpected in the tie in before we cover it back up, so surprises get priced up front.

Planning a project like this?

When you are ready for a number on your own project, we will walk it with you and put the price in writing.